Filing Flows

Filing Flows › Nwpx Infrastructure (NWPX) › Q3 2026 › vs Q3 2025

Nwpx Infrastructure (NWPX) Q3 2026 vs Q3 2025 (year over year)

Nwpx Infrastructure's revenue rose $28.3M (+19%) from $151M in Q3 2025 to $179M in Q3 2026. The biggest changes: Water Transmission Systems +$28.0M (+27%); Precast Infrastructure and Engineered Systems +$292K (+0.6%). Gross margin 21.3% against 21.3% (+0.0 pts).

Nwpx Infrastructure, Q3 2026: revenue $179M (+19% year over year), operating margin 13.6%, net earnings $18.2M, operating cash flow $27.4M. The chart draws each line against Q3 2025, the increases inside each band.

Nwpx Infrastructure: what changed, Q3 2026 vs Q3 2025Nwpx Infrastructure: what changed, Q3 2026 vs Q3 2025Water Transmission Systems$28.0MCost of revenue$22.3MFree cash flow (OCF − capex)$7.2MOperating cash flow$6.4MGross profit$6.0MPre-tax earnings$5.7MOperating profit$5.3MNet earnings$4.7MWorking capital & other$1.3MIncome tax$998K

Margins

Q3 2026Q3 2025Change
Gross margin21.3%21.3%+0.0 pts
Operating margin13.6%12.6%+1.0 pts
Net margin10.2%8.9%+1.2 pts
Free cash flow margin11.3%8.7%+2.6 pts

Every line

LineQ3 2026Q3 2025Change%
Water Transmission Systems$132M$104M$28.0M+27%
Precast Infrastructure and Engineered Systems$47.5M$47.2M$292K+0.6%
Revenue$179M$151M$28.3M+19%
Gross profit$38.2M$32.1M$6.0M+19%
Cost of revenue$141M$119M$22.3M+19%
Operating profit$24.3M$19.0M$5.3M+28%
Operating expenses$13.9M$13.1M$762K+6%
Pre-tax earnings$24.0M$18.2M$5.7M+31%
Net earnings$18.2M$13.5M$4.7M+35%
Income tax$5.7M$4.7M$998K+21%
Share-based compensation$1.6M$1.2M$398K+32%
Working capital & other$7.5M$6.2M$1.3M+20%
Operating cash flow$27.4M$21.0M$6.4M+31%
Free cash flow (OCF − capex)$20.4M$13.2M$7.2M+54%
Capital expenditures$7.0M$7.8M−$776K-10%

Questions

How much did Nwpx Infrastructure's revenue grow year over year in Q3 2026?

Nwpx Infrastructure's revenue rose $28.3M (+19%) from $151M in Q3 2025 to $179M in Q3 2026.

What drove Nwpx Infrastructure's revenue change in Q3 2026?

Water Transmission Systems +$28.0M (+27%); Precast Infrastructure and Engineered Systems +$292K (+0.6%).

Q3 2026 results → · Compare in the interactive Sankey →