Ur-Energy (URG) gave its guidance on Nov 9, 2026: Revenue (segment) $46.9M for FY2026. Ur-Energy's 10-Q filed Nov 9, 2026 makes 42 forward-looking statements.
Guidance and outlook
Latest guidance
| Metric | Period | Range | Change |
|---|---|---|---|
| Revenue | FY2026 | $46.9M | new |
From the earnings release filed Nov 9, 2026 (8-K on EDGAR).
Forward-looking statements, 10-Q filed Nov 9, 2026
- We are operating our Lost Creek Project, our flagship in situ recovery (“ISR”) mining facility, and our Shirley Basin Project, our second ISR uranium mine.
- We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project, which are both located in Wyoming and are the only two mineral properties that we currently deem to be individually material.
- Although many of these initiatives remain in proposed or early stages, and their timing, final form, and ultimate effect on the Company cannot be predicted with certainty, they collectively reflect a sustained commitment to nuclear energy and domestic fuel-supply security that the Company believes strengthens the long-term demand outlook for domestic uranium production.
- Although we expected the average production grade from wells in MU2 to decrease because the HHs
- are now in the latter part of their production curve, for the reasons described below, we were unable to offset that decrease as expected by continuing to add HHs in MU1 Phase 2, increasing flow rates by bringing a sand filtration system online, and other process improvements.
- Production grades are expected to vary from quarter to quarter as we move through mine units, and average production grades in Lost Creek mine units, including MU1 and MU2, have generally outperformed our estimates in total.
- Average production grades are expected to increase as we move into new mine units that have not previously been subject to ISR operations, including mine unit five (“MU5”), which is our next planned mine unit.
- The filtration system has been effective in decreasing fines and increasing production flow rates, but our ability to utilize the system effectively was impacted more than we expected by constraints in our capacity to manage wastewater generated when backflushing the filtration system.
- We renewed exploration activities in the Great Divide Basin (“GDB”), Wyoming in the third quarter of 2025, beginning with our Lost Solider Project.
- Although the geology of the project is largely understood with the benefit of data from approximately 4,000 historical drill holes, additional hydrogeologic data gathering and characterization are underway to enable us to better plan for potential permitting and development of the site.
- During the third quarter of 2026, we completed pump testing of the last of three aquifer-test well clusters that we installed prior to the quarter and continued work on baseline environmental studies in anticipation of possible permitting of the project.
- We also significantly advanced work on a technical report for the project during the quarter.
Ur-Energy's latest quarter
Ur-Energy, Q3 2026: revenue $12.4M (+97% year over year), operating margin -217.6%, net loss $17.7M, operating cash flow −$34.8M. The chart follows the revenue to costs, profit and cash.
Questions
Did Ur-Energy raise or lower its guidance?
Ur-Energy (URG) gave its guidance on Nov 9, 2026: Revenue (segment) $46.9M for FY2026.
What does Ur-Energy expect?
We are operating our Lost Creek Project, our flagship in situ recovery (“ISR”) mining facility, and our Shirley Basin Project, our second ISR uranium mine. We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project, which are both located in Wyoming and are the only two mineral properties that we currently deem to be individually material. Although many of these initiatives remain in proposed or early stages, and their timing, final form, and ultimate effect on the Company cannot be predicted with certainty, they collectively reflect a sustained commitment to nuclea
Updated Nov 10, 2026. Read automatically from SEC filings and public data; errors are possible. Not investment advice.